0.909
Miles
5,653
LF Storm Drain Pipe
37,076
Tons of GAB
77,000
CY of Dirt
The Lexington Road project is a 3-year project that started in April 2021 and consists of 0.909 miles of widening and reconstruction on the SR10 Loop at Lexington Road. Throughout the project, our Roadway Division will lay over 5,000 linear feet of storm drain, move over 77,000 cubic yards of dirt, and lay over 37,000 tons of GAB.